A whole home remodel is an exciting opportunity to give a makeover to your existing home layout, but it can be overwhelming if you’re not prepared with an average cost by your side. Whether it’s a per square foot home renovation project or kitchen and bathroom remodels, creating your dream living space and understanding what to do during the whole house remodeling phase can minimize stress and set realistic expectations within your financial limits.
At Preferred Construction, we guide homeowners through the whole house remodel process with local building codes to electrical wiring. The following is a step by step guide for your home renovation projects per square foot:
1. Planning and Design (2–4 Weeks)
All successful home remodels start out with thoughtful planning. This involves square foot consultations, site visits, and collaboration with design staff to coordinate your objectives and overall costs. We help you choose premium materials, space arrangements, and finishes that are appropriate for your estimated house renovation cost. It’s also the time to determine whether you’re staying at home during the house remodel or arranging for temporary residence.
Look at our Services page to see how we tailor each home remodel idea within the overall home renovation cost.
2. Permits and Pre-Construction (2–6 Weeks)
After your whole home remodel process, we arrange the necessary permits and approvals. In this phase of your home remodel process, there can be structural analysis, coordination with the municipal government, and more. We will also develop an entire house project schedule with estimated home renovation cost, so you know what to expect of your renovation project.
3. Demolition (1–2 Weeks)
Your whole house renovation is already in progress now. Walls can be removed, outdated fixtures are removed, and the home is ready for its new layout. Demolition is loud and messy. From bathroom renovations to electrical work, we aim to cause as little disturbance as possible during your home renovations.
4. Structural and Mechanical Work (2–4 Weeks)
The behind-the-scenes work for your whole house renovation starts with electrical and plumbing work. This is where your home’s foundation is upgraded as per your renovation costs. Some home remodel inspections with detailed plan for window treatments will be taken up.
5. Interior Finishes (4–8 Weeks)
The visual transformation of your whole house renovation begins with extensive repairs and electrical work. New drywall, painting, flooring, etc are installed. These sgteps involved take the longest of your whole home remodel project but delivers the most visible progress.
You will start to see your home renovation ideas come to life, from open floor plans to modern kitchens and spa-like bathrooms made from high quality materials at competitive pricing.
6. Final Walkthrough and Touch-Ups (1 Week)
The last stretch of the renovation process involves a close walk-through with your contractor to inspect your kitchen remodel workmanship and small repairs. This phase ensures the significant changes meet your standards of your home renovation project, while keeping the final cost under control.
We don’t count the job finished until you’re completely satisfied with every square foot of your renovation project. Customer satisfaction is our number one priority, check what makes us different in each and every project we finish.
7. Move-In and Setup (1 Week)
Once your complete home remodel process is done last touches of polishing have been applied, it’s time to settle in and enjoy your living space. Save money by opting for professional cleaners for your dream home to maintain your renovation ideas.
Incase of smart home functionalities, our project managers will provide walk-throughs to assist you in your new house remodel space that boats exceptional craftsmanship.
8. Post-Renovation Support and Warranty
At Preferred Construction, our relationship doesn’t have to end when the entire home project is finished. We offer post-home renovation support and warranties by certified structural engineers with step by step guides. If something goes wrong after move-in, we’re just a phone call away. We stand behind our work and believe in long-term satisfaction.
9. Long-Term Maintenance Tips
Keeping your brand-new, renovated home in balance will mean that it will be functional for many years to come. We provide tips on maintaining your flooring, countertops, paint and other various factors. We also have seasonal maintenance tips as per your project budget. Ongoing maintenance helps you address issues before they surpass your overall cost.
10. Enjoy Your New Space
You’ve made it through an entire house renovation, now it’s time to celebrate! Whether it’s hosting a party in your living space or simply enjoying in your dream home kitchen, take pride in the structural improvement. The whole home renovation is now detailed to your final cost.
Total Timeline: 3 to 6 Months
Based on size, an entire house remodeling project usually lasts three to six months along with kitchen renovations. Having an expert team for your home renovations, like Preferred Construction means you will save money with accurate estimates for premium materials.
Let’s Get Started with Your Remodeling Journey
If you’re ready for some renovation and remodeling projects to turn your house into something functional and yours, we are waiting for you. Preferred Construction doesn’t merely construct, we collaborate with you to create your ideal home. With customer satisfaction at our core, contact us today regarding your home remodel project and see your vision come to life within your project budget.